Construction — Feasibility, Traffic, Electrical

Build with confidence. We translate code, compliance, and constructability into clear scopes—so your schedule, budget, and approvals stay on track.

Construction planning and field
Plan • Permit • Build
Replace with site/field image

Core services for OC/CA projects

Right-sized scopes that align with California codes, CEQA, and local agency submittals.

Feasibility studies

Constructability, utilities, permitting pathways, cost/schedule ranges, and risk registers for early go/no-go decisions.

  • Entitlement & permit map (city/county/state)
  • Utilities & site constraints (survey/GIS overlays)
  • Prelim cost model & 90‑day schedule
Traffic feasibility (CEQA / SB 743)

VMT‑focused screening and study scopes consistent with OPR and Caltrans guidance—plus ITE forecasting where needed.

  • VMT screening & thresholds; TIS scope if triggered
  • Trip generation (ITE) & network context
  • Mitigation options & monitoring plans
Electrical (Title 24 / CEC)

Code‑aligned one‑lines, load calcs, lighting/controls compliance, and acceptance testing packages.

  • NEC/CEC‑based design & panel schedules
  • Title 24 Part 6 + CALGreen Part 11 coordination
  • Short‑circuit/coordination & arc‑flash labels
Stormwater & environmental

SWPPP and Construction General Permit coverage with practical BMPs and field training.

  • CGP coverage & QSP/QSD coordination
  • Site BMP plans & inspection cadence
  • Closeout & Notice of Termination support
Safety & constructability

Cal/OSHA‑aware sequencing, traffic control basics, and constructability reviews that de‑risk the field.

  • Method statements & work area plans
  • Temporary power & laydown planning
  • Owner/contractor pre‑task checklists
Agency coordination

Submittals aligned to local handbooks with fast iteration on comments to keep permits moving.

  • City/County plan check packets
  • Utility & encroachment permits
  • Pre‑con & closeout documentation

Let’s de‑risk your build.

From first feasibility to final acceptance—we’ll keep it clear and moving.