Electrical — CEC / Title 24
We prepare clean, code‑aligned electrical packages for California plan check: one‑lines, load calcs, lighting/controls compliance, and acceptance testing—coordinated with energy and green building requirements.

What we deliver
Artifacts that clear plan check and keep the field safe.
Design & calculations
- One‑line diagrams & fault current paths
- Load calculations & panel schedules
- Short‑circuit, coordination, and arc‑flash labels
Lighting & controls (Title 24)
- Lighting power density (LPD) compliance
- Automatic daylighting & shut‑off controls
- Acceptance testing forms & installer certificates
Coordination
- CALGreen & Energy Code cross‑checks
- Utility service applications & metering
- Temporary power & construction sequencing
Compliance quick reference
We align our packages to the codes and standards used in California plan review.
California Electrical Code
Title 24, Part 3 (CEC, based on NEC) for wiring methods, overcurrent protection, grounding, and equipment.
Energy Code
Title 24, Part 6 for lighting power density, controls, acceptance testing, and documentation.
CALGreen
Title 24, Part 11 for mandatory green measures (nonresidential)—coordination with electrical scope.
Plan check package
Clear, complete, and ready for comments.
Drawings
- E‑sheets (power, lighting, one‑lines)
- Details (grounding, equipment, clearances)
- Title 24 compliance notes
Calcs & forms
- Load calcs, SCCR/coordination results
- Title 24 forms & acceptance test docs
- Manufacturer cut sheets
Closeout
- As‑builts & circuit directories
- O&M and safety labels
- Inspection punchlist tracking