EIR / CEQA — Clarity from scoping to certification

We prepare decision‑grade CEQA documents and supporting studies—so reviewers, counsel, and the public can follow your analysis and your decision‑makers can rely on it.

EIR preparation and public review
image placeholder

Our CEQA approach

Traceable methods, clear findings, and a clean administrative record.

Scoping & notices

  • Notice of Preparation / Intent, scoping plan, agency matrix
  • Project description, objectives, baseline, alternatives
  • Schedule & comment logistics (public + agencies)

Technical studies

  • Traffic/VMT, air/GHG, bio, cultural, noise, hazards, utilities
  • Thresholds & significance criteria; cumulative methods
  • Mitigation measures, performance standards, monitoring

Document production

  • Draft EIR layout, figures, and tables aligned to Guidelines
  • Response to comments & errata; findings & statement of overriding considerations (if needed)
  • Mitigation Monitoring & Reporting Program (MMRP)

Typical deliverables

Reviewer‑ready, with a clean trail to the admin record.

CEQA docs
  • IS/ND/MND or Draft/Final EIR
  • Notices (NOP/NOA/NOC); mailing list & proof of publication
  • Findings, SOC (if warranted), MMRP
Studies & appendices
  • Tech memos and models (e.g., CalEEMod, VMT, noise)
  • Record search & surveys; methods and QA/QC
  • References, preparers, distribution
Admin record support
  • Master index, correspondence, comment matrices
  • Version control & docketing
  • Hearing materials & staff reports